Third Street Bridge Replacement Project
City of Napa, as a sub-consultant to J. Muller International
DC&E conducted an environmental review of the replacement of the Third Street Bridge over the Napa River, which is a component of the Napa River Flood Reduction Project. The environmental review process, which followed all Caltrans and FHWA requirements, included a visual quality assessment of the proposed bridge design and an investigation of historic buildings and archaeologically significant resources on and near the site. DC&E also prepared a Preliminary Environmental Study (PES) form, a Regular Categorical Exclusion, and the necessary permit applications. DC&E was responsible for coordinating with all involved federal and state agencies throughout the bridge design process.